Rainwater Tank Installation Support

In order to fully extend the life of your concrete rainwater tank, site preparation is essential:

  • Excavate to the required depth plus 75mm (or more if required to achieve a fall from gutter height) and then back-fill with a layer of 10mm-12mm gravel or screenings.  The tank will then be placed directly onto this level land.
  • Ensure the gutter outlet is above the tank inlet.
  • Check delivery access with Ri-Industries.
  • A minimum height clearance of 8 metres is required when unloading.
  • 4.7 metres is needed for the truck to pass under trees and overhead power lines.
  • 4 metres clearance is required between gate posts.
  • Please highlight the position of any underground drains or cables.Trucks will not drive over any concrete or sealed areas without indemnity being signed (including all foundations).
  •  Please ensure the unloading site is level.
  •  Ri-Industries strongly recommends your tank not be left empty for extended periods.
  •  If any tank is partially buried more than 900mm in the ground there is a possibility that it may float unless precautions are taken. We suggest that the tank is filled with water immediately after placement to at least ground level, until the back-fill soil has compacted.
  •  If you have any doubts regarding your installation a site inspection can be arranged.

 

 

 

 

 

 

Please also note that:

  • Each above ground tank is painted and includes a 75mm diameter drain outlet made of brass. The overflow is ready to take a 90mm PVC stormwater pipe.  Male brass fittings can be fitted in the tank depending on customer requirements eg. for fire fighting purposes.
  • Underground rainwater tanks can be installed down to a maximum of 2 metres below the ground but this requires riser pipes to allow access at ground level.
  • Please Note : Ri-Industries advises that all underground tanks are filled at least 50%-75% with water in all chambers to stop floatation.

When your rainwater tank is delivered on-site, it will be positioned in the prepared hole by the driver and is ready to be connected, so preparation beforehand is key.  Contact us if you have any queries regarding site preparation or installation or if you need the names of any local installers or excavators.

  • 4 metres clearance is required between gate posts.
  • Please highlight the position of any underground drains or cables.
  • Trucks will not drive over any concrete or sealed areas without indemnity being signed (including all foundations).
  • Please ensure the unloading site is level.
  • Ri-Industries strongly recommends your tank not be left empty for extended periods.
  • If any tank is partially buried more than 900mm in the ground there is a possibility that it may float unless precautions are taken. We suggest that the tank is filled with water immediately after placement to at least ground level, until the back-fill soil has compacted.
  • If you have any doubts regarding your installation a site inspection can be arranged.